Figure 1                                                                    
  Project Orientation Worksheet  
   
  Description     Plan Booth for 2000 KCPE&O Show                               Project No. 2000 Show    
  Who is Responsible?   DP & WF             Authorized/Initiated by     JD       Date 18-Apr-00  
  When is Project Due? 17-May-00 When is Planning Due 01-May-00 Sheet 1   of   1  
                                                                             
  PROJECT ESSENTIALS  
  1 Project Objective(s):   Develop plan for Atlas Equipment Co. Booth                          
                                                                         
  2 External Conditions:   Booth located at Bartle Convention Center (top floor).  Utilities required to be  
    provided per specs.                                                          
  3 Situation(s):   Booth on flat floor.  No columns.  Surrounded by aisles.  Very short set-up and tear-down  
    times.                                                                
  4 Scope/Extent:   Define (3D) arrangement.  Specify utilities requirements.                    
                                                                         
  5 Form of Project's Output:   Booth installed per 3-dimensional drawing prepared by Atlas Equipment Co.  
                                                                         
   
  PLANNING ISSUES             Imp Resp Proposed Resolution Ok'd by  
  1   What products to include       A Team   Focus in weekly meeting     JD    
  2   Which utilities are required       E CS                                        
  3   What peripheral equipment is required I Dan                                        
  4   Need quiet place to confer with cust's   I Dave                                        
  5                                                                  
  6                                                                  
                    Dominance/Importance Rating --- -- --> I <--- -- -- Mark "X" if beyond control of project      
   
  FUNDAMENTALS DEVELOPMENT   For Particular Subject                                  
    Area of : Show Booth preparation    
       
    1 Displays Equipment Systems   Equipment A  
    Products        
    2 Placement Presentation Access   Presentation B  
             
    3 Layout Placement Location   Arrangement C  
    Arrangement        
                                                                             
   
  PLANNING SCHEDULE               April Notes &  
  Task or Action Required to Plan Who 17 18 19 20 21 24 25 26 27 28 Action  
  1 Define & schedule project JD                          
                                                 
  2 Clarify included Equipment Team                        
                                                 
  3 Interact Equipment & Presentation JD                        
                                                 
  4 Integrate Arrangement JD/DP                        
                                                 
  5 Develop alternatives Team                        
                                                 
  6 Evaluate alternatives Team                        
                                                 
  7 Detail & Plan to DO Team                        
                                                 
  8                                                              
  9                                                              
  10                                                              
   
  Reference Notes:  
  a.                           c.                                            
  b.                           d.